Skip to content

BASEL – LUGANO CORRIDOR

Basel – Lugano groupage

From the Rhine to Ticino, cross Switzerland via the Gotthard by sharing the available capacity.

WHY GROUP ON THIS CORRIDOR

Basel – Lugano, the north-south crossing

Linking the northern border to Ticino is a long crossing (about 280 km via the Gotthard, close to 3 hours). On a journey of this kind, running empty is expensive. Groupage allows loads to be pooled between shippers using the same corridor, in either direction.

📍 ~280 km🕑 ~2h50Standard · Bulky

Cost-effective over long distances

The longer the journey, the more sharing makes a difference.

Gotthard corridor

A strategic north-south corridor used every day.

Lighter footprint

Every return trip filled is one empty run fewer.

BASEL – LUGANO

Post or find a route